Successful electrical and instrumentation installation for EEW Energy from Waste in Stapelfeld
Project data
- Commissioner
- SAR Elektronik Ltd
- Customer
- EEW Energy from Waste
- Industry
- Energy
- Construction location
- Germany
- Contruction period
- 16 months
- Contributors
- 20
Scope of delivery & service
The project centred on the complete electrical and control installation, including:
- 320 kilometres of cable routing
- 500 cable connections
- 30 km of cable support system, including protective conduits and accessories
- 50 switch cabinets, including medium-voltage systems
- Substructures & installations
- Installation of 6 service transformers
- 30 kV connections to the main transformer
The installation comprised medium-voltage and low-voltage systems, I&C equipment, instrumentation and all associated installation work. Our team handled both the precise implementation and the coordinated project management throughout the construction process.
Technical challenges – masterfully overcome
Throughout the project, our experienced Bähr team has supplemented and further developed the engineering work. The complex installations in the areas of medium-voltage, low-voltage, I&C, cable routing and instrumentation were carried out safely and efficiently.
A partnership that inspires confidence
Our collaboration with SAR Elektronik GmbH was characterised by a structured approach, open communication and a high level of professionalism. The result: a successfully completed project that once again highlights the performance and reliability of Bähr Anlagenbau.